Watching Metered Lamps

"Energy is Yours for the Savings" TIPS

FFPC Conditions of Service

Current Energy Conservation Programs

Renewable Generators

Applications for renewable generation are being taken by the Ontario Power Authority beginning October 1, 2009. Information provided by Fort Frances Power Corporation in the links below will be updated regularly. Please visit often.

This is a Provincial Program
The Ontario Power Authority (OPA) has introduced the Renewable Energy Feed-In Tariff (FIT) Program to the province of Ontario.

The fundamental objective of the FIT Program, in conjunction with the Green Energy Act, is to encourage the development of renewable energy generating projects throughout the province.

Larger FIT projects
A generator participating in the FIT Program will generate electricity by renewable means and be paid for each kilowatt-hour produced.

Renewable energy sources which qualify for the FIT Program include:

  • Wind Turbine
  • Water Turbine
  • Renewable Biomass
  • Bio-gas
  • Bio-fuel
  • Landfill Gas
  • Solar (Photovoltaic)

As a first step to participating in the Feed-In Tariff Program please visit the province's FIT Program website.

Smaller microFIT projects
Projects which are located on residential properties and are smaller than 10 kilowatts in capacity may apply for connection under the microFIT Program. The microFIT Program allows for an expedited application and connection process.

As a first step to participating in the microFIT Program please visit the province's microFIT Program website.

Educating Yourself about Renewable Generation
Some additional helpful links may be found below:

Natural Resources Canada – Renewable Energy Information Page

ESA –Guidelines for Inverter Based Micro-Generating Facility <10kW

Canadian Renewable Energy Association

Canadian Solar Industries Association

Canadian Wind Energy Association

Ontario Energy Board

Connecting Your Project to Fort Frances Power Corporation Distribution System

Fort Frances Power has information regarding connection capacity and an estimate on the localized costs to connect a microFIT project to our distribution system is listed below:

Estimated Connection Costs

The following are estimated costs for connection to the Fort Frances Power Corporation Distribution System as valid in March 2010:

One Time Installation Fee:

Supply of bi-directional meter $100.00
Installation Cost $75.00
Account Setup Fee for new account $30.00


Disconnect / Reconnect Fee $45.00

$245.00


Monthly customer account charge
(OEB Rate Order EB-2009-0326)
$5.25

Next Steps

  1. After you have educated yourself about this provincial program and decide to make the investment to move forward, please ensure that you have
    • registered with the OPA and
    • received a registration ID number for setting up your "My microFIT Homepage".
  2. Once you have your registration ID number, you can contact us regarding other details for completing the Program Application on your personal OPA page that has been set up. This number is different than the reference number assigned to each project application once it is submitted.
  3. microFIT and FIT Generators Inquiry for Metering and Engineering by email

| Home | Customer Services | Rates | Energy Conservation | Renewable Generators | Directors | Contact Us |

Copyright 2010 All Rights Reserved. Site by Times Web Design.